建筑工程英语口语句子(精选46句)

编辑:daniel

建筑工程英语口语句子1

1、 What do you think of this erection work?

2、Spiral-welded steel pipe is available in sizes from 6 to 36 inches、

3、We shall plete the manhour requirements for the site fabrication (site erection ) of thisSeamless steel tube is made in sizes for 1/8 to 24 inches、

4、 We use Scientific-management system for material shortage and its control、

5、We usually use elbow (bend, flange, tee, reducer) as a kind of pipe fitting、

6、Does the bolt fit the nut?

7、The design of the process piping is performed directly on a model of the project、

8、We can perform the pipe by following operations: cutting and mechanical chamfering, manual and automatic welding、

9、 The pressure vessel must be inspected by our authoritative organization-Administration of Labour、

10、Typical structural steel shapes include beams, channels, angles and tees、

11、This alloy is mainly posed of element chromium and nickel (titanium, vanadium, manganese)、

12、The spherical tank (gas holder , container) will be shipped in the condition of edge prepared and bent plates、

13、 The working team will finish the job next week、

14、 The distilling column( absorber, column evaporator, regenerator, column washer) is a kind of equipment for outdoor installation、

15、Our pany cover all construction activities, that is : piling , civil engineering, mechanical erection, piping, electrical, instrumentation, painting and insulation work、

16、We prefer welding to riveting、

17、 The cooler (condenser, separator, boiler, generator, scrubber, stripper, heat exchanger )is a pressure vessel、 It is subject to the pressure vessel code、

18、 We are adjusting (installing, checking, aligning , leveling, purging )the equipment、

19、The standards “GB” and “YB” provide the method of testing for materials in our country just like the standard ASTM in America、

20、This low (middle, high ) pressure blower (pump) will be assembled in the No、3 workshop、

21、 We can adjust the levelness of the machine by means of shim and screw jack、

22、This pipe is made of carbon steel (stainless steel ,cast iron, plastic)、

23、 What is the feature about it?

24、 The TG70 steam turbine has a operation speed of 9600 rotations per minute( RPM)、

25、The puter generates isometric drawings and prints out bill of materials、

26、 The new reciprocating (centrifugal, opposed-balanced) pressor will be installed next week、

27、Two types of end are standard on steel pipes and fittings, that is flanged and screwed、

28、 The average traffic fuel (gasoline) consumption of this lorry is 0、3 liter per kilometer (l/km)、

建筑工程英语口语句子2

1、 After seven days , the grouted mortar will have concreted, then we shall tighten the anchor bolts、

2、Hydraulic oil (lubrication oil )which having a viscosity of about 4、5°Eat 50 ℃ can be used for this vehicle (machine)、

3、The maximum allowable misalignment of the coupling is 0、02mm、

4、There are four broad classifications of steel : carbon steels, alloy steels, high-strength low-alloy steels and stainless steels、

6、Our piping prefabrication workshop covers a total area of 1000m2、

7、How many radial (axial ) clearnance are there in this bush (journal bearing , thrust bearing) ?

8、Piping erection work include: prefabrication, placing, aligning, welding and bolting、

9、The model is an actual working tool for piping、

10、The alignment of the coupling should be performed by two dial gauges、

11、Copper, zinc, lead, aluminium, bronze and brass are nonferrous metals or alloys、

12、What is the installation elevation of this pipeline?

13、 I think that the on-site training will be necessary for the tank、

14、This pipeline will be installed on the No、8 pipe rack 、

15、 The construction material answers our purpose satisfactorily、

16、 These materials are imported from abroad(supplied by the Seller)、

17、Do you know how to assemble (adjust )this new machine?

18、What is the feature of this cracker (cracking furnace, heating furnace, reactor, mixer, centrifuger, belt-conveyer) ?